Logistics and cold storageTilburgExample case

No heavier grid connection needed thanks to 1.2 MWh of storage

A cold store with 650 kWp of solar was running into its contracted capacity. A battery shaves the peaks and earns on the market.

grid costs
−18%
benefit per year
€78k
payback time
6.2 years

The challenge

The distribution centre wanted to charge electric trucks, but at peak times it was already close to the 800 kW of its connection. A heavier connection had a waiting time of years in the region.

Approach

  1. 1

    Analysed twelve months of quarter-hour data: the peaks rarely lasted longer than 45 minutes.

  2. 2

    Worked out two scenarios: peak shaving only, and peak shaving with day-ahead and imbalance trading.

  3. 3

    Installed a 1,200 kWh / 600 kW battery; the EMS partner controls it within the limits of the connection.

Result

Since commissioning, import has stayed below 700 kW, apart from one maintenance day. The benefit is above the base scenario of the business case; the client follows it month by month in the portal.

Actual vs business case

Indicative

€ cumulative · Feb 2026 – Sept 2026

Ahead of plan · to Sept 2026
+€3,180
Paid back according to plan
Aug 2032
Ahead of planBehind plan
“We thought we needed a bigger grid connection. After the analysis, a battery turned out to be cheaper.”
Mark van Dijk, managing director · Van Dijk Koeltransport