Van Dijk Koeltransport · Logistics and cold storage · Tilburg
No heavier grid connection needed thanks to 1.2 MWh of storage
A cold store with 650 kWp of solar was running into its contracted capacity. A battery shaves the peaks and earns on the market.
Read the case- grid costs
- −18%
- benefit per year
- €78k
- payback time
- 6.2 years